Axis Ductwork Ltd.


The River Building EC4, known also as Cannon Bridge House,  had not been modernised since the early 1990’s. It has now undergone radical internal and external refurbishments on behalf of the
Blackstone Group.

Axis Ductwork installed a typical office fit-out installation on levesl 1-4 with modifications to existing basement ductwork. The majority of the ductwork installed was on display, meaning it was installed to the highest aesthetic standard possible.